I have over 35 years' experience of construction and engineering law in connection with projects (private, public sector and privatisation) in Hong Kong and in almost all countries in the Asia Pacific region. My practise primarily involves arbitration of construction disputes, having been involved in over 250 cases, often as advocate. However he deals with both contentious and non-contentious matters and is Legal Advisor to the Hong Kong Construction Association.
I have regularly advised a wide range of clients and industry participants from the public and private sectors and is experienced in all forms of dispute resolution including court, arbitration, mediation and adjudication including having acted as adjudicator in a number of disputes arising out of the construction of the Hong Kong International Airport. I have advised the Hong Kong Government on implementation of past legislation and was one of the drafters of the Arbitration Ordinance Cap 609.
I have also been advisor to the Hong Kong Construction Association (“HKCA”) for 30 years and as such has been instrumental in the lobbying of law reform in Hong Kong, in particular I were involved in drafting the Hong Kong Arbitration Ordinance that was enacted in 2011 and were recently involved in helping to redraft the Domestic Arbitration Rules of the HKIAC. I have also lobbied the Hong Kong Government for many years to enact security of payment legislation and is now involved in helping with the drafting of that legislation.
I am also a qualified arbitrator and mediator, a member of Hong Kong International Arbitration Centre Panel of Mediators and List of Arbitrators and a member of Chartered Institute of Arbitrators (Hong Kong Branch) Panel of Arbitrators.
Experience
Projects and Non-Contentious Experience
Design, Build and Operate and Concession Projects
· Advised the Hong Kong Football Club in respect of the redevelopment of Happy Valley, an undertaking with the Royal Hong Kong Jockey Club; including drafting of development agreement, operation agreement, contractor's warranty and various ancillary agreements and advising on the terms of various land swap agreements
· Advised the Franchise Holder of the Concession to build and operate the new Hong Kong Airport Hotel, including advising on lease, construction and operation agreements
· Drafted documentation for Tate's Cairn Tunnel BOT project including Turnkey Contract, major sub-contracts (including E & M) including preparation of tender packages, Design Consultant’s Agreement, Independent Checking and Site Engineer's Agreement and various performance bonds and guarantees. Liaised with Tunnel Company's advisers on negotiations with Government and assisted in the drafting of the governing Ordinance and BOT Contract. Also advised on matters arising during the course of construction
· Conducted negotiations with Government in respect of the drafting of the DBO Contract for Kowloon Bay Waste Transfer Station on behalf of the Contractor/Operator. Drafted major sub-contract for project as well as Design Consultant’s Agreement and Independent Checking Engineer's Agreement
· Advised the Hong Kong Government on the framework and structuring of the contracts required for the design, build, finance, operation and aftercare of Hong Kong's strategic landfills including the Drafting of Conditions of Contract, performance bonds and guarantees, and Independent Consultants Agreement for the standard form DBO Contract for New Territories Strategic Landfills (Core Consultancy). Also advised on the regulatory framework required for the introduction of direct charging in respect of the use of the facility
· Drafted Special Conditions and one of multi-disciplinary team advising the Hong Kong Government which drafted the Tender package for the SENT Landfill DBO Contract. Assisting in the evaluation of the tenders for the project
· Advised the Hong Kong Government in the preparation of separate DBO tender documentation packages for refuse transfer stations in Hong Kong at Island West, West Kowloon and Outlying Islands
· Advised the Hong Kong Government in connection with Hong Kong's first Special Waste Incineration Facility including advising on the structure of this DBO contract and the legal framework for the introduction of direct charging in respect of the use of the facility, drafting the DBO contract and assisting the multidisciplinary team with the tender preparation
· Advised the Franchise holder on the documentation for the Second crossing BOT project in Malaysia/Singapore, including advising on the terms of the Concession Agreement, Inter Government Treaty between Governments of Malaysia and Singapore and drafting necessary construction contracts and consultancy agreements
· Advised the Hong Kong Government in connection with Hong Kong's first Low Level Radioactive Waste Storage Facility including advising on the structure and framework of this DBO contract drafted the DBO contract and assisting the multidisciplinary team with the tender preparation
· Advised Kuala Lumpur International Airport Berhad on the structure and documentation for Kuala Lumpur's new international airport including necessary construction contracts and consultancy agreements. Also assisted in the preparation of Invitation for Proposals for BOT cogeneration plant for supply of chilled water to the airport and drafted concession agreement
· Advised the Hong Kong Government on legal issues arising as part of a study to review the operation of DBO entered into by the Environmental Protection Department in previous 15 years and suggest future strategy for the next generation of DBO contracts.
· Advising PRC contractor on concession for alumina project in Guinea
· Advising Governments of Hong Kong, Guangdong and Macau on structuring and implementation of the Hong Kong-Zhuhai-Macau Bridge, an iconic 50 kilometre bridge and tunnel structure. Advised on and drafted project and inter government agreements
Building, Civil Engineering and Design and Build Contracts
· Advised Hong Kong developer on construction of a large commercial development in Nathan Road including review and drafting of construction contracts and consultancy agreements
· Advised the Kowloon Canton Railway Corporation in relation to all construction contracts, joint venture agreements and all ancillary documentation for the Ho Tung Lau joint development
· Drafted main contract, sub-contract and various bonds and guarantees for construction of Hong Kong Park
· Advised HKCA and tenderers in their negotiations with the Provisional Airport Authority over the tender documentation for Hong Kong International Airport
· Advised the Hong Kong Association of Consulting Engineers in its negotiations with the Provisional Airport Authority over the tender documentation for engineering consultancies for Hong Kong International Airport
· Advised tenderer on bid for E & M works for passenger terminal building at new airport in Hong Kong
· Advised tenderer on bid for luggage handling contract for passenger terminal building at new airport in Hong Kong
· Advised large electrical utility in Hong Kong in drafting standard form Building and Civil Engineering forms of Contract
· Advised a number of contractors on conditions of contract for hotels, commercial and residential developments in Hong Kong and the region
· Advised contractor on construction of factory in China, including drafting building contract
· Advised the Hong Kong Football Club in respect of the replacement of the club pitch on three occasions
· Drafted the design and build contract for the second airport hotel at the New Hong Kong International Airport
· Drafted joint venture agreements in connection with Turnkey Contract for waste water treatment plant in Thailand
· Advised on documentation for turnkey contract for 700 MW coal fired power station in the People's Republic of China, as well as joint venture agreement
· Advised large electrical utility in Hong Kong including drafting contracts for the construction of power facilities and supply of generators, including for the construction of a 700 MW coal fired facility
· Advised supplier of plant on documentation for turnkey contract for 700 MW coal fired power station in the Philippines (BOT scheme) including consideration of Power Purchase Agreement, as well as advising on terms of proposed joint venture agreement for contractor consortium
· Advised large local utility on consultancy agreement for advising on construction of Meizouwan Power Station in China.
· Advised Hong Kong developer on construction of a large commercial development in Nathan Road including review and drafting of construction contracts and consultancy agreements
· Drafted consortium and joint venture agreements for multi-international tenderers, and advised on tender documentation for Airport Projects including West Kowloon Reclamation, Tsing Ma Bridge and the Airport Reclamation Contract
· Drafted complex consortium and joint venture agreements for tenderer for Stonecutters Bridge
· Advised the Kowloon Canton Railway Corporation in relation to all construction contracts, joint venture agreements and all ancillary documentation for the Ho Tung Lau joint development
· Drafted and negotiated various agreements for the construction of a large container freight transfer station in Hong Kong, including development agreement and turnkey contract
· Advised the Hong Kong Government on the regulatory framework, structure and form of contract for the implementation of restoration schemes involving the private sector for exhausted landfills in Hong Kong, including drafting contracts assisting multidisciplinary team to prepare tender packages for Shuen Wan Landfill and Urban Landfill
· Advised Hong Kong Government in the preparation of tender documentation for implementation of charging scheme for all landfills in Hong Kong
· Advised engineering consultancy in negotiations for design and supervision agreement with a turnkey contractor on a large mass transit project in Thailand, including drafting of agreement
· Advised engineering consultancy in negotiations for design and supervision agreement with a turnkey contractor on a large mass transit project in Singapore, including drafting of agreement
· Advised HKCA on the terms of the Kowloon Canton Railway Corporation Conditions of Contract for Design and Build Works and the Conditions of Contract for Civil Engineering and Building Works for the West Rail Project and subsequently negotiating changes to the same with the Corporation
· Advised HKCA on the terms of the Mass Transit Railway Corporation (“MTRC”) Conditions of Contract for Design and Build Works and the Conditions of Contract for Civil Engineering and Building Works (including Target Cost) for the West Rail Project and subsequently negotiating changes to the same with the Corporation
· Advised HKCA on the terms of the MTRC Conditions of Contract for Civil Engineering and Building Works (including Target Cost) for the High Speed Rail and Shatin to Central Link Entrustment Projects and subsequently negotiating changes to the same with the Corporation
· Advised the project manager and negotiated agreement with concession company for Inchon Airport Railway, a US$2 billion BOT project, the first of its kind in Korea
· Advised Hong Kong Hospital Authority in drafting contracts for system wide E & M services for a large hospital
· Drafted joint venture agreements in connection with Turnkey Contract for waste water treatment plant in Thailand
Legislation
· Advised Hong Kong Government and assisted in the preparation of the regulatory framework and legislation for the implementation of a trade effluent surcharge
· Advised HKCA on Hong Kong Arbitration Ordinance, representing HKCA on Department of Justice committee and drafting sub-committee. One of three drafters of Arbitration Ordinance Cap. 609
· Advising Government on implementation of Security of Payment Legislation
Advisory And Dispute Resolution
· Extensive experience in dispute resolution in the building, construction and engineering industries, in excess of 250 cases. High Court proceedings to the House of Lords and Court of Final Appeal; cases involving breach of contract and negligence, numerous arbitration proceedings as representative and advocate to final hearing again involving contract and negligence claims. Appointments as adjudicator in disputes concerning Hong Kong International Airport. Involvement in about thirty mediations, most of them large ones and two of which involved claims against engineers for professional negligence
Tunnels
· Advised main contractor joint venture on contract issues for design and construction of the BOT contracts for Tate's Cairn Tunnel, Western Harbour Crossing and Eastern Harbour Crossing, all in Hong Kong
· Advising Hong Kong Harbour Tunnel Company on various issues arising out of defects appearing during operation of the tunnel.
· Advising Eastern Harbour Crossing Company on numerous issues arising during its concession period
· Acting for developer of Housing Project in claim under Sewage Tunnel Ordinance for compensation arising out damage to development caused by tunnel works
· Acting for the international joint venture contractor in arbitration proceedings against the Government arising out of the termination of a sewage scheme cross harbour bored tunnel contract (Claim of HK$1.5 billion)
· Advising international JV contractor on issues arising out of construction of Hong Kong West Drainage Tunnel.
· Advising international contractor on claims arising out of contract for Tsuen Wan Drainage Tunnel
Airports
· Acting for international JV contractor building the terminal building for Hong Kong International Airport, having an advisory role from pre-tender to completion of the building and thereafter in major arbitration and mediation proceedings against the Airport Authority, leading a team of six lawyers (Contract value HK$12 billion, claim in excess of HK$1 billion)
· Advising the contractor who constructed the HK$10 billion reclamation for the Hong Kong International Airport, during the course of construction
· Acting for runway light system contractor in major High Court proceedings brought by sub-contractor
· Advising contractor in arbitration proceedings on contract for airfield tunnels, including High Court proceedings for enforcement of Dispute Review Panel decision
Buildings
· Advised during the construction of Pacific Place II in Hong Kong as well as drafted supplemental documentation to the Main Contract.
· Advised the main contractor on issues arising out of the construction of world's then tallest building in Taipei
· Acting for a sub-contractor in arbitration proceedings against the contractor arising out of the construction of the wave pool at Ocean Park
· Acting for insurers of Employer against engineering/architectural consultants in High Court proceedings for professional negligence arising out of the design of a plant room in a major residential development in Aberdeen, Hong Kong
· Acting for the Bank of East Asia in the Landmark case against a contractor and professional advisers for negligence in the design and construction of cladding on the bank building (Claim of HK$50 million). Acting in the High Court, Court of Appeal and Court of Final Appeal. The case was a Landmark decision for Hong Kong on the question of limitation of proceedings
· Acting for engineering consultants in defending arbitration proceedings brought by an Employer in respect of the design and supervision of a newspaper printing facility and subsequently in appeal proceedings in the High Court
· Acting for international contractor in ICC Arbitration Proceedings arising out of the termination of a contract (FIDIC) for a Shanghai Golf and Country Resort Development (Claim of US$40 million)
· Acting for international contractor in mediation proceedings for claims for extensions of time and loss and expense arising out of the construction of Cathay City, the headquarters of Cathay Pacific Airways (Claim of HK$150 million)
· Acting for Hong Kong developer in arbitration proceedings against contractor in respect of claims for extensions of time and loss and expense arising out of a large high-rise development
· Acting for contractors in a number of arbitration proceedings against Hong Kong Housing Society arising out of delays to major housing project
· Acting for Hong Kong developer in arbitration proceedings against contractor arising out of Stelux House, a major commercial building, including claim for extensions of time and loss and expense and including major defective works (Claim of HK$150 million)
· Acting for developer in arbitration proceedings against contractor, defending claims for extensions of time and loss and expense arising out of Titus Square, a large commercial development
· Acting for lift sub-contractor in arbitration proceedings against the contractor for claims for extensions of time and loss and expense arising out of high-rise development and in subsequent appeal proceedings
· Advising international contractor during the course of construction of the Hong Kong Convention and Exhibition Center, also acting in arbitration proceedings against the roof sub-contractor
· Advising international contractor during the course of construction of the Hong Kong Park, including acting in High Court proceedings against sub-contractors
· Advising international contractor during the course of construction of the Hong Kong Government Stadium
· Acting for E & M sub-contractor in High Court proceedings against contractor arising out of construction of the Harbour City development
· Acting for the contractor in arbitration proceedings against Hong Kong University of Science and Technology arising out of construction of university facilities
· Acting for Hong Kong Employer in various proceedings arising out of the collapse of a building during the course of demolition resulting in fatalities including inquest and arbitration proceedings against demolition contractors
· Acting for lift sub-contractor in arbitration proceedings against Contractor for delays and loss and expense arising out of the construction of the Great Eagle Centre commercial development
· Advising architectural consultancy in arbitration proceedings brought by developer of casino in Macau.
· Advising international contractor in respect of alleged defects in Dragonair headquarters
· Advising international JV contractor on issues arising out of tender for iconic Tamar Hong Kong Government Headquarters.
· Advising contractor in disputes arising out of contraction of cargo terminal at Hong Kong International Airport
· Advising contractor on issues arising out of construction of extension to Peninsular Hotel
· Advising international contractor on claims arising out of Bawra Finance Centre Doha
· Acting for contractor in mediation and arbitration proceedings arising out of term contract with Government
· Advising international contractor on issues with its design consultant arising out of design and construction of international cruise terminal
· Acting for contractor in arbitration against the Government arising out of construction of New Territories school related to unforeseen ground conditions
· Acting for Hong Kong Football Club in arbitration against supplier and installer of sports surface
· Acting for fit out contractor for Qantus lounge including mediation proceedings in Sydney
· Acting for 8 contractors in consolidated set of 27 arbitrations against the Housing Authority on one issue arising in numerous term contracts for maintenance of housing. The first such case in Hong Kong
· Acting for contractor in major arbitrations against Housing Authority arsing out of major residential development
Roads and Bridges
· Advising international JV contractor during the construction of a major road and noise enclosure contract. Acting for the contractor in arbitration and mediation proceedings. Claims of around US$40 million involving delay analysis, physical impossibility and claims for loss and expense
· Advising international contractor during the construction of a major road contract forming part of the Hong Kong International Airport. Acting for the contractor in arbitration and mediation proceedings against the Government and subsequently appeal proceedings in the High Court (Contractor's claims in excess of HK$100 million)
· Acting for international contractor in mediation/adjudication proceedings against the Government arising out of suspension of major road widening design and build project due to dangers which were claimed to be impossible to overcome. Also acting for the same contractor in arbitration proceedings against its engineering consultants for professional negligence arising out of separate issues
· Acting for international contractor constructing one of the largest cable stayed bridges under a design and build contract, the Ting Kau Bridge, during the course of construction and in two sets of mediation proceedings against the Government for claims for extensions of time and loss and expense (Claims in excess of HK$300 million). Also acting for the contractor in mediation proceedings against its engineering consultants in respect of claims for professional negligence (Claims in excess of HK$100 million)
· Acting for engineering consultants in defending arbitration proceedings for professional negligence arising out of the design of the Kap Shui Mun Cable Stayed Bridge under a design and build contract (Claim of HK$350 million)
· Acting for sub-contractor in arbitration proceedings and subsequent appeal to High Court arising out of construction of foundations for bridge project spanning border of Hong Kong and China. This leave to appeal application from the arbitrator's award was the first successful one ever made in Hong Kong
· Advising international contractor on issues arising during construction of Tsing Ma Bridge
· Advising international contractor on claims arising out of design and construction of Golden Ears Cable Stayed Bridge, Vancouver.
· Acting for PRC contractor in arbitration against Government of Cyprus arising out of design and construction of Limasol-Paphos Highway
· Advising international contractors on issues arising during construction of the Hong Kong-Zhuhai-Macau Bridge on separate packages and related infrastructure
· Advising international school on matters related to refurbishment and extension contracts
· Acting for contractor in arbitration against the Government arising out of contract for extension of the Tolo Highway
· Advising international contractor on claims arising out of East West Highway Sri Lanka
Railways
· Advising international JV contractor during the construction of two major station contracts on the West Rail Project undertaken by KCRC. Acting for the contractor in arbitration and mediation proceedings against a foundation sub-contractor
· Advising international JV contractor during the construction of two major station contracts on the East Rail Project undertaken by KCRC
· Acting for international JV contractor in arbitration proceedings against a sub-contractor arising out of the contract for the construction of Central Station, one of the stations for the airport railway
· Advising the foundation sub-contractor on issues arising following discovery of fraudulently defective piling carried out by his sub-contractor on the Hong Kong Central Station contract, forming part of the new airport railway
· Advising Taiwanese contractor on inter JV relationships on major Taiwan High Speed Rail Contract
· Acting for international contractor in Kuala Lumpur Regional Centre arbitration arising out of the construction of major rail station in Malaysia
· Advising international contractor building new Kowloon Station, part of the new airport railway, during the course of construction and acting in High Court proceedings against a piling sub-contractor
· Acting for engineering consultancy in major arbitration proceedings brought by the developer of associated developments to one of the new stations on the new airport railway. Such arbitration proceedings being for professional negligence (Claim of HK$1.5 billion).
· Advising engineering consultants on claims for professional negligence brought by design and build contractors on the Singapore MRT Project
· Acting for international contractor in claims and arbitration against MTRC in respect of West Kowloon Station, forming part of the new airport railway
· Advising international contractor on claims arising on Manilla LRT
· Advising international contractor on issues arising out of tunnel renovation contract for MRT system
· Advising various contractors on major issues arising during construction of the MTRC’s High Speed Rail, West Rail and South Island Line projects
· Acting for international contractor on on MTRC’s High Speed Rail Project in respect of major diaphragm wall sub-contract arbitrations, leading a team of 12 lawyers in three inter related arbitrations for two sub-contracts, including appeal proceedings in Court of First Instance and Court of Appeal. One of the largest ever construction cases in Hong Kong
· Acting for international contractor on MTRC’s High Speed Rail project in arbitration proceedings brought by sub-contractor regarding write of of plant in water damage, including appeal proceedings in Court of First Instance
· Acting for international contractor on MTRC’s High Speed Rail Project in arbitration proceedings brought by sub-contractor arising out of sheet piling re-measurement sub-contract
Energy
· Acting for major power generation developer in High Court proceedings against solicitors for professional negligence in drafting of EPC contract for construction of coal fired power station in China (Claim of HK$150 million)
· Advising the adjudicator on legal issues arising out of his adjudication of a major dispute between the contractor and Employer for the Black Point Power Station
Engineering and Process
· Advising PRC contractor on major claims arising out of flooding of mine development project in Bangladesh
· Acting for international contractor in claim against bondsman arising out of termination of contract for construction of large engineering facility
· Acting for European cement manufacturer in ICC Arbitration Proceedings against international contractor claiming extensions of time and loss and expense and including major defective works arising out of design and construction of a production plant in Vietnam. Leading a large team (Claims in excess of US$100 million)
· Acting for engineering consultancy in UNCITRAL arbitration in Thailand in defending proceedings for professional negligence arising out of design and suspension of construction of port facilities (Claim of HK$100 million)
· Acting for the contractor building the River Trade Terminal in Hong Kong during the course of construction and in respect of its claims for extensions of time and loss and expense
· Advising the steel-work contractor in respect of proceedings arising out of the failure of a steel bridge during construction of a port facility
· Advising engineering consultants in arbitration and mediation proceedings brought against it for professional negligence arising out of the design of a container facility (Claim of HK$100 million)
· Acting for M & E sub-contractors in High Court and arbitration proceedings arising out of a large port development in the PRC.
· Acting for the purchaser of an M & E Engineering Contractor in claims against the vendor for breach of warranty and misrepresentation
· Advising joint venture international contractor during the course of construction of the Central Reclamation including representation in mediation. Also acting for same contractor in sub-contract arbitrations
· Acting for PRC contractor in arbitration proceedings against the Government arising out of a river training contract claiming invalidity of liquidated damages provisions on basis of penalty (Claim of HK$17 million)
· Acting for Joint Venture developers in High Court proceedings against Government for breach of development agreement arising out of the construction of a new town in the New Territories. Leading large team in one of Hong Kong’s largest cases, where the hearing lasted in excess of one year and in subsequent court of Appeal proceedings (Claim of HK$2 billion)
· Acting for reclamation and site
· Acting for Government organization in High Court formation contractor in two sets of arbitration and one mediation proceedings against Government concerning claims for re-rating arising out of unforeseen ground conditions, delay and loss and expense proceedings against engineering consultant for professional negligence arising out of design and supervision of slope works adjoining a hospital
· Advising international contractor on issues arising out of contraction of Tung Chung Cable Car, a target cost contract.
· Advising contractor on disputes arising out of mid-levels escalator
· Advising contractor on claims arising out of contract for temporary waste sorting facility
· Acting for Ling Yan Monastery in arbitration against slope remediation contractor
· Advising international contractor on claims arising out of contract for construction of Kotmale Dam Sri Lanka
· Advising international JV contractor on claims arising out of Sludge Treatment Facilities DBO project
· Acting for international contractor in arbitration arising out of Chemical Treatment Facility DBO project
Areas of Expertise
· Construction Litigation
· International Construction Arbitration
· Construction Advisory & Disputes
· Risk management & contract advice
Education
Qualification year and jurisdiction
Career History (most recent position held)
· [Date], PolyU Hong Kong – MSC
· [Date], University of Leicester – PHD
· [Date], Wales – LLB (Hons)
· 1984 – Hong Kong
· 1983 – England and Wales
· 1987 to present – Pinsent Masons LLP, [Job title]
· 1984 to 1987 – Deacons, Hong Kong, [Job title]
· 1983 to 1984 – Rowe Watts and Wood, [Job title]
· 1980 to 1982 – Goldstones, [Job title]
Location
Language
Professional Memberships
· Hong Kong
· English
· Admitted as Barrister and Solicitor, Australian Capital Territory and High Court, 1990
· Fellow of the Chartered Institute of Arbitrators and Hong Kong Institute of Arbitrators
Publications
· Article – Contributor to "Hong Kong Construction Mediation Gaining Ground" published in Asian Dispute Report February 1991
· Article - "Risks of Marine Accidents with Reclamation Contracts" published in Asian Architect and Contractor, July 1991
· Article - "Solid Waste Disposal in Hong Kong" published in Asian Law Journal December 1992 (co-written with J. Rockey of the Environmental Protection Department of the Hong Kong Government)
· Article - "Dispute Resolution in the New Hong Kong International Airport Core Programme Projects" published in The International Construction Law Review, January 1993
· Article - "BOT Projects and the Role of the Contractor" published in Asian Law Journal November 1993
· Article - "Infrastructure Growth Via BOT" published in the Professionals Guide to Asia Pacific and the Gulf States, 1993
· Article - "Dispute Resolution in the New Hong Kong International Airport Core Programme Projects-Part 2" published in The International Construction Law Review, January 1994
· Article - "Dispute Resolution in the New Hong Kong International Airport Core Programme Projects-Part 3" published in The International Construction Law Review, January 1995
· Article – “Managing Risk in Construction – Who Pays? Extreme Conditions (or Physical Impossibility)” published in The International Construction Law Review, April 2001
· Article – “Dispute Resolution in the New Hong Kong International Airport Core Programme Projects – Postscript” published in the International Construction Law Review, January 2002
· Article – “The Use of Experts in Construction Disputes – A Hong Kong Perspective” (jointly with Paul Teo) published in Mealey’s International Arbitration Report, April 2002
· Article – "Hong Kong Arbitration Law Reform : An Alternative View" (jointly with Julian Cohen) published in Asian Dispute Review, January 2003
· Article – "Contractor's Claim for Bid Failure" published in International Law Office, 18 September 2006
· Article – "The Hong Kong Arbitration Ordinance – Proposed Changes" published in Asian International Arbitration Journal, (2009) Vol. 5 Issue 2
· Article – "Some Personal Observations on Hong Kong International Arbitration Centre's Domestic Arbitration Rules 2012" published in Asian Dispute Review, April 2014
· Book – "The Interpretation and Uniformity of the UNCITRAL Model Law On International Commercial Arbitration: Focusing on Australia, Hong Kong and Singapore" published in 2016 by Wolters Kluwer.
· Article – "The Evolution of Claims arising out of unforeseen physical conditions in Hong Kong" published in The International Construction Law Review, April 2017
1. Hourly rate: HK$4,000
2. One day mediation ( 8 hours):
3. Half day mediation ( 4 hours):
4. Preparation: (will not waive)
5. Perusal of documents: (will not waive)
6. Venue: (will not waive)